3025 Anson One — Building Directory Upgrade
Building directory upgrade at 3025 Anson, Coquitlam: site measurements, new layout, black and brushed aluminum fabrication, individual lettering and standoff preassembly.
Existing Shop Site Survey
Multiple exterior and interior views document the starting condition. These photographs preserve the starting point for comparison with the design concepts and project results.
Planned Shop Transformation
The approved visual plan coordinates the new menu presentation, cabinetry and shelving finish, showcase recovering, service-area organization and two feature window murals.
Follow the Work as It Happens
This page is designed to grow with the project—from concept and material selection through onsite installation and the completed shop.
2. FUTURE INSTALLATION PREVIEW
3. PREP & INSTALLATION
4. FINAL LOOK

Signs Depot is upgrading the building business directory at 3025 Anson in Coquitlam. The work brings together a new tenant layout, black backing boards, brushed aluminum panels, individual cut lettering and gold header lettering. The photos document the process from the existing directory and site measurements through workshop preassembly with standoff hardware.
Current stage: Fabricated and preassembled in the workshop, prepared for installation.
01 · Existing Directory & Site Measurements
We documented the existing directory and measured its height, width, row spacing and mounting positions to guide the replacement design.




02 · New Directory Design & Layout
The new layout pairs a black backing board with a brushed aluminum face, clear tenant rows and a dedicated suite-number column.

03 · Board Fabrication & Machining
The black board and brushed aluminum panel were fabricated, with mounting holes machined for the standoff assembly.



04 · Individual Lettering Cutting & Application
Tenant names, suite numbers and divider lines were cut individually, then aligned and applied to the brushed aluminum panel.



05 · Gold Header & Standoff Preassembly
Gold header lettering was applied to the prepared black board. The directory panels were then preassembled with standoff hardware in the workshop.

